Home
List your patent
My account
Help
Support us
Converting Asphalt Thermal Energy into Electricity
[Category : - RENEWABLE ENERGY]
[Viewed 26 times]
Stage Duration Description
Phase 1: Research & Design 3 months Feasibility study, material selection, design of systems
Phase 2: Prototype Development 6 months Development of a small-scale prototype for testing
Phase 3: Testing & Optimization 4 months Field testing, data collection, and system optimization
Phase 4: Full-scale Implementation 12 months Deployment on selected roads and integration with energy grid
Phase 5: Monitoring & Maintenance Ongoing Continuous monitoring of performance and system adjustments
9. Conclusion
This proposal aims to explore the possibility of converting the thermal energy of asphalt into electricity, which could offer a novel and sustainable solution for urban energy generation. Through the use of thermoelectric materials, thermal photovoltaic systems, and heat engines, we can harness wasted heat and convert it into useful electrical energy. Although there are challenges related to efficiency and initial cost, the potential benefits, such as renewable energy generation and reduced carbon emissions, make this project a valuable endeavor for the future of energy production.
Patent publications:No publication
Asking price:
Make an offer
[ Home
| List a patent
| Manage your account
| F.A.Q.|Terms of use
| Contact us]
Copyright PatentAuction.com 2004-2017
Page created at 2025-07-31 9:27:20, Patent Auction Time.